2017 Environmental, Social And Governance Report
Extracted ESG KPIs
KPIs are organized by ESG aspects.
The types of emissions and respective emissions data.
| Indicator | Unit | 2012 | Report Pages |
|---|---|---|---|
| First generating unit capacity for Phase 2 of gas turbine generation project in Hangzhou Huadian Banshan Power Company | KW | 415000 | 8 |
Direct and/or indirect energy consumption by type (e.g. electricity, gas or oil) in total (kWh in '000s) and intensity (e.g. per unit of production volume, per facility).
| Indicator | Unit | 2003 | 2006 | 2007 | 2008 | 2010 | 2011 | 2014 | 2015 | 2016 | 2017 | Report Pages |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Annual generating capacity | billion KWH | 191.719 | 5 | |||||||||
| Capacity of each biomass power generation unit in Anhui Huadian Suzhou Biomass Energy Limited Company, Phase 1 | KW | 12500 | 7 | |||||||||
| Chongqing Fengjie Power Plant supercritical condensing coal-fired generating units capacity | KW | 600000 | 8 | |||||||||
| Company's installed capacity | KW | 30000000 | 8 | |||||||||
| Company's installed capacity after acquisition of Huadian Hubei Power Limited Company | KW | 40000000 | 8 | |||||||||
| Company's installed capacity increase after acquisition of Huadian Hubei Power Limited Company | KW | 5120000 | 8 | |||||||||
| Company's total installed capacity | KW | 20000000 | 7 | |||||||||
| Gas-steam combined cycle power generator unit capacity at Tianjin Huadian Fuyuan Thermoelectricity Limited Company | KW | 200000 | 8 | |||||||||
| Grid-connected PV power generation at Ningxia Ningdong Shangde Solar Energy Company for Phase 1 | KW | 10000 | 8 | |||||||||
| Heating capacity | million GJ | 81.8285 | 5 | |||||||||
| Hydropower sector unscheduled downtime | zero | 5 | ||||||||||
| Installed capacity generated by clean energy | KW, MW | 10130 | 5, 6, 8 | |||||||||
| Installed capacity of supercritical coal-fired generating units in Xinxiang Power Limited Company, Henan | KW | 660000 | 7 | |||||||||
| Installed capacity of two coal-fired generating units in Anhui Chizhou Jiuhua Power Generation Company, Phase 1 | KW | 200000 | 7 | |||||||||
| Installed capacity put into production | KW | 1949500 | 8 | |||||||||
| Installed capacity realized in 2007 | KW | 6095000 | 7 | |||||||||
| Percentage of installed capacity generated by clean energy | 20.54% | 8 | ||||||||||
| Proportion of clean energy in installed capacity | % | 20.53 | 5 | |||||||||
| Proportion of clean energy in total installed capacity | 20.54% | 6 | ||||||||||
| Total installed capacity | MW | 49390.1 | 6 | |||||||||
| Total installed capacity of the Company | KW | 10000000 | 7 | |||||||||
| Wind power project capacity in Ningxia Ningdong, Phase 1 | KW | 45000 | 7 | |||||||||
| Year-on-year increase in generating capacity | % | 0.87 | 5 | |||||||||
| Year-on-year increase in heating capacity | % | 13.1 | 5 |
Description of the significant impacts of activities on the environment and natural resources and the actions taken to manage them.
| Indicator | Unit | 2017 | Report Pages |
|---|---|---|---|
| Thermal power units reduction in unscheduled downtime | times on a year-on-year basis | 5 | 5 |
| Thermal power units with zero unscheduled downtime | units | 13 | 5 |
Total workforce by gender, employment type (for example, full- or part-time), age group and geographical region.
| Indicator | Unit | 2017 | Report Pages |
|---|---|---|---|
| Distribution of Age of Huadian Power International's Staff - Aged 24 and below | % | 7 | 34 |
| Distribution of Age of Huadian Power International's Staff - Aged 25-29 | % | 15 | 34 |
| Distribution of Age of Huadian Power International's Staff - Aged 30-34 | % | 10 | 34 |
| Distribution of Age of Huadian Power International's Staff - Aged 35-39 | % | 11 | 34 |
| Distribution of Age of Huadian Power International's Staff - Aged 40-44 | % | 18 | 34 |
| Distribution of Age of Huadian Power International's Staff - Aged 45-49 | % | 21 | 34 |
| Distribution of Age of Huadian Power International's Staff - Aged 50-54 | % | 12 | 34 |
| Distribution of Age of Huadian Power International's Staff - Aged 55 and above | % | 6 | 34 |
| Distribution of Posts of Huadian Power International's Staff - Management position | % | 22 | 34 |
| Distribution of Posts of Huadian Power International's Staff - Other position | % | 1 | 34 |
| Distribution of Posts of Huadian Power International's Staff - Production position | % | 65 | 34 |
| Distribution of Posts of Huadian Power International's Staff - Professional/technical position | % | 7 | 34 |
| Distribution of Posts of Huadian Power International's Staff - Service position | % | 5 | 34 |
The percentage of employees trained by gender and employee category (e.g. senior management, middle management).
| Indicator | Unit | 2017 | Report Pages |
|---|---|---|---|
| Person-time of trainees of different training contents - On-the-job training - Adaptability training | Person-time | 131024 | 36 |
| Person-time of trainees of different training contents - On-the-job training - Continuing education | Person-time | 1568 | 36 |
| Person-time of trainees of different training contents - On-the-job training - Other training | Person-time | 91389 | 36 |
| Person-time of trainees of different training contents - On-the-job training - Qualification training | Person-time | 62767 | 36 |
| Person-time of trainees of different training contents - On-the-job training - Technical level training | Person-time | 2021 | 36 |
| Person-time of trainees of different training contents - Participating the training provided by the group company and the superior organizations | Person-time | 8733 | 36 |
| Person-time of trainees of different training contents - Total | Person-time | 297502 | 36 |
| Person-time of trainees of different types - Enterprise leadership (including director's supervisor) | Person-time | 3170 | 36 |
| Person-time of trainees of different types - Professional manager | Person-time | 45688 | 36 |
| Person-time of trainees of different types - Professional technician | Person-time | 31049 | 36 |
| Person-time of trainees of different types - Skilled personnel | Person-time | 217596 | 36 |
| Person-time of trainees of different types - Total | Person-time | 297502 | 36 |
| Rate of all staff training | % | 90 | 36 |
The average training hours completed per employee by gender and employee category.
| Indicator | Unit | 2017 | Report Pages |
|---|---|---|---|
| Average training hours of each employee | Hour | 79 | 36 |
| Average training hours of each enterprise leadership (including director's supervisor) | Hour | 134 | 36 |
| Average training hours of each professional manager | Hour | 74 | 36 |
| Average training hours of professional technician | Hour | 75 | 36 |
| Average training hours of skilled personnel | Hour | 79 | 36 |
Description of practices relating to observing and protecting intellectual property rights.
| Indicator | Unit | 2017 | Report Pages |
|---|---|---|---|
| Hubei Company accepted patents | 19 | 21 | |
| Hubei Company accepted patents for invention and technology | 2 | 21 | |
| Hubei Company accepted patents for utility models | 17 | 21 | |
| Hubei Company innovative creative proposals | 8 | 21 | |
| Hubei Company newly increased authorized patents for utility models | 17 | 21 | |
| Hubei Company projects approval for science and technology projects | 9 | 21 | |
| Hubei Company science and technology investment expense | million RMB | 83.8388 | 21 |
| Hubei Company scientific and technical papers published | 58 | 21 | |
| Hubei Company scientific and technological achievements | 5 | 21 | |
| Zhejiang Branch invention technology patents won | 6 | 21 | |
| Zhejiang Branch projects collected | 31 | 21 | |
| Zhejiang Branch projects nominated for final | 1 | 21 | |
| Zhejiang Branch projects nominated for quarter-final | 7 | 21 |
Description of quality assurance process and recall procedures.
| Indicator | Unit | 2017 | Report Pages |
|---|---|---|---|
| Zhejiang Branch awards for management innovation, scientific and technological progress, and QC achievements | 40 | 21 |
Focus areas of contribution (e.g. education, environmental concerns, labour needs, health, culture, sport).
| Indicator | Unit | 2017 | Report Pages |
|---|---|---|---|
| Zhejiang Branch projects recommended for 2018 annual science and technology project | 3 | 21 | |
| Zhejiang Branch scientific and technical papers published | 40 | 21 | |
| Zhejiang Branch software monographs | 4 | 21 | |
| Zhejiang Branch standard release items participated | 2 | 21 | |
| Zhejiang Branch utility model patents accepted | 5 | 21 |
The types of emissions and respective emissions data.
| Standard Indicator | Unit |
|---|---|
| Airborne Particulate Matter (PM) Emissions | tons |
| NOâ‚“ Emission Intensity (By Revenue) | g/kwh |
| NOâ‚“ Emissions | tons |
| SOâ‚“ Emission Intensity (By Revenue) | g/kwh |
| SOâ‚“ Emissions | tons |
Direct (Scope 1) and energy indirect (Scope 2) greenhouse gas emissions (in tonnes) and, where appropriate, intensity (e.g. per unit of production volume, per facility).
| Standard Indicator | Unit |
|---|---|
| Direct GHG Emissions (Scope 1) | ten thousand tons COâ‚‚ |
| Indirect Energy Emissions (Scope 2) | ten thousand tons COâ‚‚ |
| Total GHG Emissions | ten thousand tons COâ‚‚ |
| Total GHG Emissions Intensity (By Energy) | kg/kwh |
Total hazardous waste produced (in tonnes) and, where appropriate, intensity (e.g. per unit of production volume, per facility).
| Standard Indicator | Unit |
|---|---|
| Total Hazardous Waste | Ton |
Total non-hazardous waste produced (in tonnes) and, where appropriate, intensity (e.g. per unit of production volume, per facility).
| Standard Indicator | Unit |
|---|---|
| Non-Hazardous Waste (Construction Waste) | Ten thousand tons |
Description of emissions target(s) set and steps taken to achieve them.
| Standard Indicator | Unit |
|---|---|
| NOx Emissions Reduction Percentage Compared to Last Year | % |
| PM Emissions Reduction Percentage Compared to Last Year | % |
| SO2 Emissions Reduction Percentage Compared to Last Year | % |
Direct and/or indirect energy consumption by type (e.g. electricity, gas or oil) in total (kWh in '000s) and intensity (e.g. per unit of production volume, per facility).
| Standard Indicator | Unit | 2017 |
|---|---|---|
| Biomass Energy | kilowatts | 25000 |
| Fossil Fuel Consumption | tons | 77845000 |
| Heating Oil Consumption | tons | 13000 |
| Hydropower Energy | kilowatts | 1959000 |
| Natural Gas Consumption | m3 | 1442932000 |
| Percentage of Renewable Energy Consumption | % | 20.54 |
| Solar Energy | kilowatts | 290700 |
| Total Energy Consumption | kwh | 191719000000 |
| Wind Energy | kilowatts | 3428900 |
Water consumption in total and intensity (e.g. per unit of production volume, per facility).
| Standard Indicator | Unit |
|---|---|
| Water Consumption | Ten thousand tons |
Description of energy use efficiency target(s) set and steps taken to achieve them.
| Standard Indicator | Unit |
|---|---|
| Energy Consumption Reduction Compared to Last Year | tons standard coal/year |
Description of whether there is any issue in sourcing water that is fit for purpose, water efficiency target(s) set and steps taken to achieve them.
| Standard Indicator | Unit |
|---|---|
| Water Consumption Reduction Compared to Last Year | cubic meters per hour |
Description of the significant impacts of activities on the environment and natural resources and the actions taken to manage them.
| Standard Indicator | Unit |
|---|---|
| Total Investment in Ecological Restoration | RMB Ten thousand |
Total workforce by gender, employment type (for example, full- or part-time), age group and geographical region.
| Standard Indicator | Unit | 2017 |
|---|---|---|
| Percentage of Employees Aged 30-50 | % | 72 |
| Percentage of Employees Aged Above 50 | % | 6 |
| Percentage of Employees Aged Below 30 | % | 22 |
| Percentage of General Employees | % | 78 |
| Percentage of Senior Management Employees | % | 22 |
Description of occupational health and safety measures adopted, and how they are implemented and monitored.
| Standard Indicator | Unit |
|---|---|
| Health Check Coverage for Employees | % |
The percentage of employees trained by gender and employee category (e.g. senior management, middle management).
| Standard Indicator | Unit | 2017 |
|---|---|---|
| Percentage of Employees Trained | % | 90 |
The average training hours completed per employee by gender and employee category.
| Standard Indicator | Unit | 2017 |
|---|---|---|
| Average Training Hours (Senior Management) | Hour | 134 |
| Average Training Hours (Technical Employees) | Hour | 75 |
| Average Training Hours per Employee | Hour | 79 |
Description of practices relating to observing and protecting intellectual property rights.
| Standard Indicator | Unit | 2017 |
|---|---|---|
| Number of Authorised Utility Model Patents | 17 | |
| Number of Invention Patents | 8 | |
| Number of Patents Granted | 23 |