2017 ENVIRONMENTAL, SOCIAL AND GOVERNANCE REPORT

Company: DCWT (3768)
Year: 2017
Published: 2018-07-25
Status: Processed

Extracted ESG KPIs

KPIs are organized by ESG aspects.

The types of emissions and respective emissions data.

Indicator Unit 2012–2017 2017 Report Pages
Ammonia nitrogen effluent level compared to national Class I Standard A emission limit at Dianchi Lake Basin plant % lower 91.8 11
BOD decrease at Kunming main city area % 42.4% 16
BOD level decrease at Kunming No. 2 Water Purification Plant (A2/O process) % 38.3% 16
Chemical Oxygen Demand (COD) effluent level compared to national Class I Standard A emission limit at Dianchi Lake Basin plant % lower 79.24 11
Company wastewater treatment capacity reaching National Class I Standard A % 93.7% 16
Emission of Chemical Oxygen Demand (COD) during reporting period tons 6962 12
Emission of ammonia nitrogen (NH3-N) during reporting period tons 297 12
NH3-N decrease at Kunming main city area % 60.6% 16
NH3-N level decrease at Kunming No. 2 Water Purification Plant (A2/O process) % 52.1% 16
Total nitrogen (T-N) effluent level compared to national Class I Standard A emission limit at Dianchi Lake Basin plant % lower 44.73 11
Total phosphorus (T-P) effluent level compared to national Class I Standard A emission limit at Dianchi Lake Basin plant % lower 72 11

Total hazardous waste produced (in tonnes) and, where appropriate, intensity (e.g. per unit of production volume, per facility).

Indicator Unit 2017 Report Pages
Aggregate dry sludge produced tons 68937 12
Dry sludge produced per 10000 tons of wastewater treated tons 1.1 12
Percentage of designed wastewater treatment capacity reaching National Class 1 Standard A % 92.54 6

Description of emissions target(s) set and steps taken to achieve them.

Indicator Unit 2017 Report Pages
Pollutant reduction goal in Kunming - Ammonia nitrogen tons 11873 12
Pollutant reduction goal in Kunming - Chemical Oxygen Demand tons 133138 12

Description of how hazardous and non-hazardous wastes are handled, and a description of reduction target(s) set and steps taken to achieve them.

Indicator Unit 2017 Report Pages
Ammonia nitrogen reduced by all factories tons 12982.22 12
Chemical Oxygen Demand reduced by all factories tons 143426.46 12
Hazardous waste disposed by qualified third-parties tons 18.27 13
Total phosphorus reduced by all factories tons 2739.08 12

Direct and/or indirect energy consumption by type (e.g. electricity, gas or oil) in total (kWh in '000s) and intensity (e.g. per unit of production volume, per facility).

Indicator Unit 2012 2017 Report Pages
Average energy consumption rate kWh/m³ 0.29 0.24 14
Energy charge RMB/kWh 0.56 14
Total electricity consumption (all factories operated by the Company) thousand kWh 175000 14

Water consumption in total and intensity (e.g. per unit of production volume, per facility).

Indicator Unit 2012–2017 2017 Report Pages
Designed wastewater treatment capacity under management services facilities thousand m³ per day 427 6
Number of running water plants in operation in Yunnan Province plants 4 6
Running water consumption by all factories tons 60000 15
TN decrease at Kunming main city area % 27.0% 16
TN level decrease at Kunming No. 2 Water Purification Plant (A2/O process) % 18.4% 16
Total designed daily production capacity of reclaimed water m³ per day 52000 6
Total designed daily production capacity of reclaimed water (Dianchi Water, 7 wastewater treatment plants) m3/day 52000 15
Total designed wastewater treatment capacity thousand m³ per day 1806 6
Total project investment for construction of sewage and supporting facilities in town and rural areas of Yiliang million RMB 396 8
Water consumption for treatment of each 10 thousand tons of wastewater ton 0.97 15

Description of energy use efficiency target(s) set and steps taken to achieve them.

Indicator Unit 2012–2017 2017 Report Pages
Average annual cost saving from energy consumption reduction million RMB 12.7 14
Electricity cost decrease RMB 10000000 15
Energy consumption decrease at Kunming No. 1 Water Purification Plant % 26.4% 16
Energy consumption decrease at Kunming No. 2 Water Purification Plant (A2/O process) % 36.9% 16

Description of whether there is any issue in sourcing water that is fit for purpose, water efficiency target(s) set and steps taken to achieve them.

Indicator Unit 2012–2017 2017 Report Pages
Investment allocated to rural areas (including 630 villages) for sewage and supporting facilities in Yiliang million RMB 260 8
Investment allocated to town areas (including 8 towns) for sewage and supporting facilities in Yiliang million RMB 136 8
Number of wastewater treatment plants in Kunming plants 14 6
Number of wastewater treatment plants in operation plants 32 6
Number of wastewater treatment plants in other parts of China plants 18 6
Number of wastewater treatment plants producing reclaimed water plants 7 6
TP decrease at Kunming main city area % 47.2% 16
TP level decrease at Kunming No. 2 Water Purification Plant (A2/O process) % 51.7% 16

Description of the significant impacts of activities on the environment and natural resources and the actions taken to manage them.

Indicator Unit 2012–2017 2017 Report Pages
Average facility utilization rate % 93.9 6
Effluent COD decrease at Kunming main city area % 57.9% 16
Effluent COD level decrease at Kunming No. 2 Water Purification Plant (A2/O process) % 61.5% 16

Total workforce by gender, employment type (for example, full- or part-time), age group and geographical region.

Indicator Unit 2017 Report Pages
Material non-compliance cases in relation to human resources laws and regulations N/A 18

Resources contributed (e.g. money or time) to the focus area.

Indicator Unit 2017 Report Pages
Annual sales volume of running water million m³ 8.99 6
Contract sum for sewage treatment plant and sewage treatment plant BOT franchise agreement in Golden Triangle Special Economic Zone, Laos million RMB 60 8

Total hazardous waste produced (in tonnes) and, where appropriate, intensity (e.g. per unit of production volume, per facility).

Standard Indicator Unit 2017
Total Hazardous Waste Intensity (By Product Volume) tons per 10000 tons wastewater treated 1.1

Description of emissions target(s) set and steps taken to achieve them.

Standard Indicator Unit 2017
Ammonia Nitrogen Emissions Reduction Compared to Last Year tons 11873

Description of how hazardous and non-hazardous wastes are handled, and a description of reduction target(s) set and steps taken to achieve them.

Standard Indicator Unit 2017
COD Reduction Compared to Last Year tons 143426.46

Direct and/or indirect energy consumption by type (e.g. electricity, gas or oil) in total (kWh in '000s) and intensity (e.g. per unit of production volume, per facility).

Standard Indicator Unit 2012 2017
Energy Consumption Intensity (By Unit Product) kWh/m³ 0.29 0.24
Total Energy Consumption kWh 175000000

Water consumption in total and intensity (e.g. per unit of production volume, per facility).

Standard Indicator Unit 2017
Recycled Water Usage m3 per day 52000
Water Consumption tons 60000

Description of energy use efficiency target(s) set and steps taken to achieve them.

Standard Indicator Unit 2012–2017
Energy Consumption Reduction Percentage Compared to Last Year % 36.9

Resources contributed (e.g. money or time) to the focus area.

Standard Indicator Unit 2017
Investment in Environmental Protection million RMB 60