2017 Environmental, Social and Governance Report
Extracted ESG KPIs
KPIs are organized by ESG aspects.
The types of emissions and respective emissions data.
Indicator | Unit | 2015 | 2016 | 2017 | Report Pages |
---|---|---|---|---|---|
Discharged gaseous radioactive waste (inert gases) to the state's annual limit - Daya Bay Nuclear Power Base | % | 0.13% | 0.14% | 0.044% | 41 |
Discharged gaseous radioactive waste (inert gases) to the state's annual limit - Fangchenggang Nuclear Power Station | % | N/A | 0.26% | 41 | |
Discharged gaseous radioactive waste (inert gases) to the state's annual limit - Hongyanhe Nuclear Power Station | % | 0.51% | 0.14% | 0.15% | 41 |
Discharged gaseous radioactive waste (inert gases) to the state's annual limit - Ningde Nuclear Power Station | % | 0.39% | 0.15% | 0.58% | 41 |
Discharged gaseous radioactive waste (inert gases) to the state's annual limit - Yangjiang Nuclear Power Station | % | 0.18% | 0.35% | 0.30% | 41 |
Discharged gaseous radioactive wastes (inert gases) as a percentage of the national standards - Daya Bay Nuclear Power Base | % | 0.13 | 0.14 | 0.44 | 92 |
Discharged gaseous radioactive wastes (inert gases) as a percentage of the national standards - Fangchenggang Nuclear Power Station | % | N/A | 0.26 | 0.39 | 92 |
Discharged gaseous radioactive wastes (inert gases) as a percentage of the national standards - Hongyanhe Nuclear Power Station | % | 0.14 | 0.18 | 0.15 | 92 |
Discharged gaseous radioactive wastes (inert gases) as a percentage of the national standards - Ningde Nuclear Power Station | % | 0.15 | 0.58 | 0.51 | 92 |
Discharged gaseous radioactive wastes (inert gases) as a percentage of the national standards - Yangjiang Nuclear Power Station | % | 0.18 | 0.35 | 0.3 | 92 |
Discharged liquid radioactive waste (radionuclides other than tritium) as a percentage of the national standards - Daya Bay Nuclear Power Base | % | 0.21 | 0.17 | 0.47 | 92 |
Discharged liquid radioactive waste (radionuclides other than tritium) as a percentage of the national standards - Fangchenggang Nuclear Power Station | % | N/A | 0.09 | 0.78 | 92 |
Discharged liquid radioactive waste (radionuclides other than tritium) as a percentage of the national standards - Hongyanhe Nuclear Power Station | % | 0.47 | 0.23 | 0.22 | 92 |
Discharged liquid radioactive waste (radionuclides other than tritium) as a percentage of the national standards - Ningde Nuclear Power Station | % | 0.24 | 0.32 | 0.38 | 92 |
Discharged liquid radioactive waste (radionuclides other than tritium) as a percentage of the national standards - Yangjiang Nuclear Power Station | % | 0.5 | 0.49 | 0.38 | 92 |
Discharged liquid radioactive waste (radionuclides other than tritium) to the state's annual limit - Daya Bay Nuclear Power Base | % | 0.21% | 0.17% | 0.074% | 41 |
Discharged liquid radioactive waste (radionuclides other than tritium) to the state's annual limit - Fangchenggang Nuclear Power Station | % | N/A | 0.09% | 41 | |
Discharged liquid radioactive waste (radionuclides other than tritium) to the state's annual limit - Hongyanhe Nuclear Power Station | % | 0.38% | 0.47% | 0.23% | 41 |
Discharged liquid radioactive waste (radionuclides other than tritium) to the state's annual limit - Ningde Nuclear Power Station | % | 0.78% | 0.24% | 0.32% | 41 |
Discharged liquid radioactive waste (radionuclides other than tritium) to the state's annual limit - Yangjiang Nuclear Power Station | % | 0.5% | 0.49% | 0.38% | 41 |
Direct (Scope 1) and energy indirect (Scope 2) greenhouse gas emissions (in tonnes) and, where appropriate, intensity (e.g. per unit of production volume, per facility).
Indicator | Unit | 2017 | Report Pages |
---|---|---|---|
Purchased electricity carbon dioxide emissions equivalent | tons | 483000 | 38 |
Total hazardous waste produced (in tonnes) and, where appropriate, intensity (e.g. per unit of production volume, per facility).
Indicator | Unit | 2015 | 2016 | 2017 | Report Pages |
---|---|---|---|---|---|
Solid radioactive waste - Daya Bay Nuclear Power Base | m³ | 317.6 | 180.4 | 276.4 | 41 |
Solid radioactive waste - Fangchenggang Nuclear Power Station | m³ | N/A | 12.9 | 41 | |
Solid radioactive waste - Hongyanhe Nuclear Power Station | m³ | 129.6 | 183.1 | 114.4 | 41 |
Solid radioactive waste - Ningde Nuclear Power Station | m³ | 101.3 | 149.6 | 183.6 | 41 |
Solid radioactive waste - Yangjiang Nuclear Power Station | m³ | 24.4 | 21.2 | 42.8 | 41 |
Solid radioactive wastes - Daya Bay Nuclear Power Base | m³ | 317.6 | 180.4 | 276.4 | 92 |
Solid radioactive wastes - Fangchenggang Nuclear Power Station | m³ | N/A | 12.9 | 101.3 | 92 |
Solid radioactive wastes - Hongyanhe Nuclear Power Station | m³ | 183.1 | 114.4 | 196.8 | 92 |
Solid radioactive wastes - Ningde Nuclear Power Station | m³ | 149.6 | 183.6 | 129.6 | 92 |
Solid radioactive wastes - Yangjiang Nuclear Power Station | m³ | 24.4 | 21.2 | 42.8 | 92 |
Description of emissions target(s) set and steps taken to achieve them.
Indicator | Unit | 2017 | Report Pages |
---|---|---|---|
Nuclear energy equivalent to carbon dioxide emission reduction | million tons | 111.29 | 6 |
Direct and/or indirect energy consumption by type (e.g. electricity, gas or oil) in total (kWh in '000s) and intensity (e.g. per unit of production volume, per facility).
Indicator | Unit | 2015 | 2016 | 2017 | Report Pages |
---|---|---|---|---|---|
Average Capacity Factor of all Nuclear Power generating Units | % | 89.59% | 24 | ||
Capacity Factor of Nuclear Power generating Units - Daya Bay Unit 1 | % | 99.98% | 24 | ||
Capacity Factor of Nuclear Power generating Units - Daya Bay Unit 2 | % | 88.74% | 24 | ||
Capacity Factor of Nuclear Power generating Units - Fangchenggang Unit 1 | % | 76.19% | 24 | ||
Capacity Factor of Nuclear Power generating Units - Fangchenggang Unit 2 | % | 80.70% | 24 | ||
Capacity Factor of Nuclear Power generating Units - Hongyanhe Unit 1 | % | 88.92% | 24 | ||
Capacity Factor of Nuclear Power generating Units - Hongyanhe Unit 2 | % | 98.08% | 24 | ||
Capacity Factor of Nuclear Power generating Units - Hongyanhe Unit 3 | % | 83.07% | 24 | ||
Capacity Factor of Nuclear Power generating Units - Hongyanhe Unit 4 | % | 85.76% | 24 | ||
Capacity Factor of Nuclear Power generating Units - Ling'ao Unit 1 | % | 89.15% | 24 | ||
Capacity Factor of Nuclear Power generating Units - Ling'ao Unit 2 | % | 96.32% | 24 | ||
Capacity Factor of Nuclear Power generating Units - Lingdong Unit 1 | % | 86.99% | 24 | ||
Capacity Factor of Nuclear Power generating Units - Lingdong Unit 2 | % | 91.33% | 24 | ||
Capacity Factor of Nuclear Power generating Units - Ningde Unit 1 | % | 83.66% | 24 | ||
Capacity Factor of Nuclear Power generating Units - Ningde Unit 2 | % | 98.80% | 24 | ||
Capacity Factor of Nuclear Power generating Units - Ningde Unit 3 | % | 95.62% | 24 | ||
Capacity Factor of Nuclear Power generating Units - Ningde Unit 4 | % | 84.38% | 24 | ||
Capacity Factor of Nuclear Power generating Units - Yangjiang Unit 1 | % | 99.61% | 24 | ||
Capacity Factor of Nuclear Power generating Units - Yangjiang Unit 2 | % | 87.97% | 24 | ||
Capacity Factor of Nuclear Power generating Units - Yangjiang Unit 3 | % | 86.49% | 24 | ||
Capacity Factor of Nuclear Power generating Units - Yangjiang Unit 4 | % | 90.00% | 24 | ||
Installed capacity in operation | MW | 21470 | 6 | ||
Installed capacity under construction | MW | 10270 | 6 | ||
Nuclear energy equivalent to standard coal consumption reduction | million tons | 42.56 | 6 | ||
On-grid nuclear power generation | GWh | 137734.87 | 37 | ||
On-grid power generation | GWh | 137734.87 | 6 | ||
Purchased electricity of CGN Power | kWh | 583690000 | 349520000 | 593580000 | 38 |
Water consumption in total and intensity (e.g. per unit of production volume, per facility).
Indicator | Unit | 2015 | 2016 | 2017 | Report Pages |
---|---|---|---|---|---|
Total water consumption | tons | 17710000 | 39 | ||
Water consumption per unit of on-grid power generation | Ton/GWh | 189 | 149 | 129 | 39 |
Description of the significant impacts of activities on the environment and natural resources and the actions taken to manage them.
Indicator | Unit | 2015 | 2016 | 2017 | Report Pages |
---|---|---|---|---|---|
Equivalent to forest area | hectares | 310000 | 6 | ||
Nuclear power generating units in operation (units) | units | 19 | 20 | 90 | |
Overall Safety, Quality and Environment Benchmarking Rating - Fangchenggang Nuclear Power Station | 7 | 7 | 7 | 21 | |
Overall Safety, Quality and Environment Benchmarking Rating - Hongyanhe Nuclear Power Station | 7 | 7 | 8 | 21 | |
Overall Safety, Quality and Environment Benchmarking Rating - Ningde Nuclear Power Station | 7 | 7 | 7 | 21 | |
Overall Safety, Quality and Environment Benchmarking Rating - Taishan Nuclear Power Station | 6 | 7 | 7 | 21 | |
Overall Safety, Quality and Environment Benchmarking Rating - Yangjiang Nuclear Power Station | 7 | 7 | 7 | 21 |
Total workforce by gender, employment type (for example, full- or part-time), age group and geographical region.
Indicator | Unit | 2016 | 2017 | Report Pages |
---|---|---|---|---|
Average paid leave per employee | days | 12 | 49 | |
Employee's social security coverage | 100% | 49 | ||
Nuclear power engineering man-hours (100000000 man-hours) | 100000000 man-hours | 0.9 | 0.88 | 90 |
Operating revenue | billion RMB | 45.616 | 6 | |
Proportion of administrative employees | 6.53% | 93 | ||
Proportion of administrative staff | % | 6.53 | 49 | |
Proportion of administrative staff aged 28 and below | % | 30.83 | 49 | |
Proportion of administrative staff aged 29-35 | % | 42.56 | 49 | |
Proportion of employees aged 28 and below | 30.83% | 93 | ||
Proportion of employees aged 29-35 | 42.56% | 93 | ||
Proportion of employees aged 36-45 | 17.60% | 93 | ||
Proportion of employees aged 46 and above | 9.01% | 93 | ||
Proportion of female employees | % | 10.90% | 49, 93 | |
Proportion of male employees | % | 89.1 | 49, 93 | |
Proportion of technicians | % | 93.47% | 49, 93 | |
Proportion of technicians aged 36-45 | % | 17.6 | 49 | |
Proportion of technicians aged 46 and above | % | 9.01 | 49 | |
Shenzhen's turnover proportion | % | 0.71 | 49, 93 | |
Total (100000000 man-hours) | 100000000 man-hours | 1.1 | 1.38 | 90 |
Total Number of Employees | 20037 | 93 | ||
Total number of employees | 20037 | 49 |
Employee turnover rate by gender, age group and geographical region.
Indicator | Unit | 2017 | Report Pages |
---|---|---|---|
Employee turnover rate (female employees) | % | 0.26 | 49 |
Employee turnover rate (male employees) | % | 2.02 | 49 |
Turnover proportion of employees aged 28 and below in Shenzhen | % | 0.6 | 49 |
Turnover proportion of employees aged 29-35 in Shenzhen | % | 1.42 | 49 |
Turnover proportion of employees aged 36-45 outside Shenzhen | % | 0.21 | 49 |
Turnover proportion of employees aged 46 and above outside Shenzhen | % | 0.05 | 49 |
Turnover proportion of regions outside Shenzhen | % | 1.57 | 49, 93 |
Turnover rate of employees aged 26 and below | 0.60% | 93 | |
Turnover rate of employees aged 26-35 | 1.42% | 93 | |
Turnover rate of employees aged 36-45 | 0.21% | 93 | |
Turnover rate of employees aged 46 and above | 0.05% | 93 | |
Turnover rate of female employees | 0.26% | 93 | |
Turnover rate of male employees | 2.02% | 93 |
Number and rate of work-related fatalities occurred in each of the past three years including the reporting year.
Indicator | Unit | 2015 | 2016 | 2017 | Report Pages |
---|---|---|---|---|---|
Death (persons) | persons | 1 | 90 | ||
Number of Industrial Accident of Contractors per 200000 Man Hours at Daya Bay Nuclear Power Station | 0.06 | 19 | |||
Number of Industrial Accident of Contractors per 200000 Man Hours at Ling Ao Nuclear Power Station | 0.17 | 19 | |||
Number of Industrial Accident of Employees per 200000 Man Hours at Hongyanhe Nuclear Power Station | 0.07 | 19 | |||
Number of Industrial Accident per 200000 Man Hours (Nuclear Power Projects) | accidents per 200000 man hours | 0.009 | 0.006 | 0.01 | 20 |
Serious injury (persons) | persons | 2 | 90 |
Lost days due to work injury.
Indicator | Unit | 2016 | 2017 | Report Pages |
---|---|---|---|---|
Unplanned automatic scram (times) | times | 1 | 2 | 90 |
Description of occupational health and safety measures adopted, and how they are implemented and monitored.
Indicator | Unit | 2015 | 2016 | 2017 | Report Pages |
---|---|---|---|---|---|
LOE events (Level 0) | times | 36 | 16 | 90 | |
LOE events (Level 1) | times | 2 | 90 | ||
Maximum Individual Radiation Dose Limit of Personnel at Daya Bay Nuclear Power Station | mSv | 7.14 | 8.277 | 6.756 | 51 |
Maximum Individual Radiation Dose Limit of Personnel at Ling'ao Nuclear Power Station | mSv | 8.51 | 6.071 | 6.61 | 51 |
Maximum Individual Radiation Dose Limit of Personnel at Lingdong Nuclear Power Station | mSv | 5.26 | 6.834 | 7.668 | 51 |
Maximum Individual Radiation Dose Limit of Personnel at Unit 1 & 2 of Fangchenggang Nuclear Power Station | mSv | 0.432 | 8.034 | 51 | |
Maximum Individual Radiation Dose Limit of Personnel at Unit 1, 2, 3 & 4 of Hongyanhe Nuclear Power Station | mSv | 5.62 | 5.404 | 7.803 | 51 |
Maximum Individual Radiation Dose Limit of Personnel at Unit 1, 2, 3 & 4 of Ningde Nuclear Power Station | mSv | 12.01 | 7.537 | 8.624 | 51 |
Maximum Individual Radiation Dose Limit of Personnel at Unit 1, 2, 3 & 4 of Yangjiang Nuclear Power Station | mSv | 6.72 | 13.078 | 7.889 | 51 |
Regular power engineering man-hours (100000000 man-hours) | 100000000 man-hours | 0.2 | 0.5 | 90 |
The percentage of employees trained by gender and employee category (e.g. senior management, middle management).
Indicator | Unit | 2017 | Report Pages |
---|---|---|---|
Training rate of female employees | 100% | 93 | |
Training rate of male employees | 100% | 93 | |
Training rate of middle managers | 100% | 93 | |
Training rate of senior managers | 100% | 93 |
The average training hours completed per employee by gender and employee category.
Indicator | Unit | 2017 | Report Pages |
---|---|---|---|
Average training hours per employee (approximate) | hours | 172 | 93 |
Description of practices relating to observing and protecting intellectual property rights.
Indicator | Unit | 2015 | 2016 | 2017 | Report Pages |
---|---|---|---|---|---|
Authorship Registration - Others | items | 2 | 22 | 25 | 33 |
Authorship Registration - Software | items | 107 | 128 | 140 | 33 |
Patent Application - Design | items | 2 | 3 | 33 | |
Patent Application - Invention | items | 285 | 458 | 437 | 33 |
Patent Application - Utility Model | items | 229 | 272 | 413 | 33 |
Patent Licensing - Design | items | 6 | 1 | 33 | |
Patent Licensing - Invention | items | 101 | 239 | 269 | 33 |
Patent Licensing - Utility Model | items | 241 | 234 | 267 | 33 |
Description of quality assurance process and recall procedures.
Indicator | Unit | 2016 | 2017 | Report Pages |
---|---|---|---|---|
Percentage of advanced value achieved for WANO indicators of units (top 1/4) | % | 72.2% | 73.75 | 90 |
WANO indicators entering top 1/10 of the world | % | 68.33% | 6, 24 | |
WANO indicators entering top 1/4 of the world | % | 73.75% | 6, 24 |
Focus areas of contribution (e.g. education, environmental concerns, labour needs, health, culture, sport).
Indicator | Unit | 2016 | 2017 | Report Pages |
---|---|---|---|---|
News conferences | 15 | 11 | 93 | |
Number of visits arranged to family members of employees with long-term business trips | visits | 229 | 51 |
Resources contributed (e.g. money or time) to the focus area.
Indicator | Unit | 2016 | 2017 | Report Pages |
---|---|---|---|---|
Number of employees reached out to in difficulty | employees | 3946 | 51 | |
Total donations | 10000 RMB | 553.5 | 1867.44 | 93 |
Volunteering hours | hours | Over 23000 | 34674 | 93 |
Direct (Scope 1) and energy indirect (Scope 2) greenhouse gas emissions (in tonnes) and, where appropriate, intensity (e.g. per unit of production volume, per facility).
Standard Indicator | Unit | 2017 |
---|---|---|
GHG Emissions from Purchased Electricity | tons | 483000 |
Total hazardous waste produced (in tonnes) and, where appropriate, intensity (e.g. per unit of production volume, per facility).
Standard Indicator | Unit | 2015 | 2016 | 2017 |
---|---|---|---|---|
Total Hazardous Waste | m³ | 925.5 | 862.2 | 1277 |
Description of emissions target(s) set and steps taken to achieve them.
Standard Indicator | Unit | 2017 |
---|---|---|
CO2 Emissions Reduction Compared to Last Year | kg | 111290000 |
GHG Emissions Reduction Compared to Last Year | kg | 111290000 |
Direct and/or indirect energy consumption by type (e.g. electricity, gas or oil) in total (kWh in '000s) and intensity (e.g. per unit of production volume, per facility).
Standard Indicator | Unit | 2015 | 2016 | 2017 |
---|---|---|---|---|
Installed capacity in operation | MW | 21470 | ||
Installed capacity under construction | MW | 10270 | ||
Purchased Electricity | kWh | 583690000 | 349520000 | 593580000 |
Water consumption in total and intensity (e.g. per unit of production volume, per facility).
Standard Indicator | Unit | 2017 |
---|---|---|
Water Consumption | tons | 17710000 |
Total workforce by gender, employment type (for example, full- or part-time), age group and geographical region.
Standard Indicator | Unit | 2017 |
---|---|---|
Number of Total Employees | 20037 | |
Percentage of Employees Aged 30-50 | % | 42.56 |
Percentage of Employees Aged Above 50 | % | 26.61 |
Percentage of Employees Aged Below 30 | % | 30.83 |
Percentage of Female Employees | % | 10.9 |
Percentage of Male Employees | % | 89.1 |
Employee turnover rate by gender, age group and geographical region.
Standard Indicator | Unit | 2017 |
---|---|---|
Turnover Rate of Employees Aged 30-50 | % | 1.63 |
Turnover Rate of Employees Aged Below 30 | % | 0.6 |
Turnover Rate of Female Employees | % | 0.26 |
Turnover Rate of Male Employees | % | 2.02 |
Number and rate of work-related fatalities occurred in each of the past three years including the reporting year.
Standard Indicator | Unit | 2016 |
---|---|---|
Number of Fatalities as a Result of Work-related Injuries | persons | 1 |
Number of Work-related Fatalities | persons | 1 |
The percentage of employees trained by gender and employee category (e.g. senior management, middle management).
Standard Indicator | Unit | 2017 |
---|---|---|
Percentage of Employees Trained | % | 100 |
Percentage of Trained Female Employees | % | 100 |
Percentage of Trained Male Employees | % | 100 |
Percentage of Trained Middle Management | % | 100 |
Percentage of Trained Senior Management | % | 100 |
The average training hours completed per employee by gender and employee category.
Standard Indicator | Unit | 2017 |
---|---|---|
Average Training Hours per Employee | hours | 172 |
Number of suppliers by geographical region.
Standard Indicator | Unit |
---|---|
Number of Total Suppliers |
Description of practices relating to observing and protecting intellectual property rights.
Standard Indicator | Unit | 2015 | 2016 | 2017 |
---|---|---|---|---|
Number of Authorised Utility Model Patents | items | 241 | 234 | 267 |
Number of Invention Patents | items | 101 | 239 | 269 |
Number of Patents Applied | items | 514 | 732 | 853 |
Number of Patents Granted | items | 342 | 479 | 537 |
Resources contributed (e.g. money or time) to the focus area.
Standard Indicator | Unit | 2016 | 2017 |
---|---|---|---|
Total Public Welfare Donations | RMB | 5535000 | 18674400 |
Total Volunteer Service Hours | hours | 23000 | 34674 |