2013 Sustainable Development Report
Extracted ESG KPIs
KPIs are organized by ESG aspects.
The types of emissions and respective emissions data.
Indicator | Unit | 2003 | 2005 | 2010 | 2013 | 2014 | 2017 | Report Pages |
---|---|---|---|---|---|---|---|---|
Exhaust gas temperature after YPC and Maoming furnace renovation projects | °C | <95 | 29 | |||||
Gasoline quality standard for unleaded gasoline, sulfur content limit | ppm | 800 | 500 | 18 | ||||
Gasoline quality standard for unleaded gasoline, sulfur content limit (national standard) | ppm | 1500 | 18 | |||||
National III standard for vehicle gasoline, sulfur content limit | ppm | 150 | 18 | |||||
Sulfur content of motor gasoline and diesel | ppm | 50 | 10 | 18 |
Description of emissions target(s) set and steps taken to achieve them.
Indicator | Unit | 2013 | Report Pages |
---|---|---|---|
Vehicle gasoline, sulfur content limit | ppm | 50 | 18 |
Direct and/or indirect energy consumption by type (e.g. electricity, gas or oil) in total (kWh in '000s) and intensity (e.g. per unit of production volume, per facility).
Indicator | Unit | 2013 | Report Pages |
---|---|---|---|
Anqing Branch Diesel Liquid-Phase Circulating Hydrogenation Unit capacity | MTPA | 2.2 | 18 |
Jiujiang Diesel Liquid-Phase Circulating Hydrogenation Unit capacity | MTPA | 1.5 | 18 |
Reduction in overall energy consumption from YPC and Maoming furnace renovation projects | % | >5 | 29 |
Shijiazhuang Branch Diesel Liquid-Phase Circulating Hydrogenation Unit capacity | MTPA | 2.6 | 18 |
Zhanjiang Dongxing Diesel Liquid-Phase Circulating Hydrogenation Unit capacity | MTPA | 2 | 18 |
Description of energy use efficiency target(s) set and steps taken to achieve them.
Indicator | Unit | 2013 | Report Pages |
---|---|---|---|
Improvement in thermal efficiency from YPC and Maoming furnace renovation projects | % | >95 | 29 |
Operation cycle of cracking furnace after renovation (YPC and Maoming projects) | days | >80 | 29 |
Description of the significant impacts of activities on the environment and natural resources and the actions taken to manage them.
Indicator | Unit | 2013 | Report Pages |
---|---|---|---|
EPC petrochemical and coal-chemical projects with successful test running | projects | 20 | 35 |
Number of inspector visits of overall safety and quality inspection for EPC projects | visits | 48 | 34 |
Petrochemical plants designed, constructed and put into operation | plants | 70 | 35 |
Total workforce by gender, employment type (for example, full- or part-time), age group and geographical region.
Indicator | Unit | 2013 | Report Pages |
---|---|---|---|
Conclusion of labor contracts in the company hit a rate of | 100% | 42 | |
Job opportunities created in China | people | 50000 | 50 |
Job opportunities created overseas | people | 5000 | 50 |
Job opportunities provided to host country | people | 5503 | 50 |
Local staff in Kazakhstan | people | 1271 | 50 |
Local staff in Saudi Arabia | people | 3918 | 50 |
Local staff in UAE | people | 314 | 50 |
Number of fresh graduates employed | 182 | 42 | |
Percentage of employees of ethnic groups | % | 2.95 | 42 |
Planned dividend per share (including applicable tax) | RMB/share | 0.324 | 12 |
Project managers and workers hired overseas | people | 13398 | 50 |
SEG staff hired in China for overseas projects | people | 1541 | 50 |
Total number of employees | 19219 | 42 |
Employee turnover rate by gender, age group and geographical region.
Indicator | Unit | 2013 | Report Pages |
---|---|---|---|
Company turnover | billion RMB | 43.572 | 4 |
Number and rate of work-related fatalities occurred in each of the past three years including the reporting year.
Indicator | Unit | 2013 | Report Pages |
---|---|---|---|
Total safety man-hours without significant accidents and zero mortality rate for employees (including sub-contractors) | man-hours | 303000000 | 36 |
Lost days due to work injury.
Indicator | Unit | 2013 | Report Pages |
---|---|---|---|
Safe execution man-hours for UAE RRE Project (Fifth Construction Company) | man-hours | 60000000 | 37 |
Safe man hours achieved | million man hours | 49.94 | 50 |
Description of occupational health and safety measures adopted, and how they are implemented and monitored.
Indicator | Unit | 2013 | Report Pages |
---|---|---|---|
Implementation rate of risk control program | % | 100 | 36 |
Occupational hazard factor monitoring rate in workplace | % | 95 | 43 |
Occupational health check-up rate for employees | % | 100 | 43 |
The percentage of employees trained by gender and employee category (e.g. senior management, middle management).
Indicator | Unit | 2013 | Report Pages |
---|---|---|---|
Number of employees from SEG Group participating in training | employees | 14200 | 44 |
Person times of operating and managing personnel participating in Sinopec’s internal and external trainings | person times | 1400 | 44 |
Person times of operators participating in Sinopec’s internal and external trainings | person times | 7200 | 44 |
Person times of technicians participating in Sinopec’s internal and external trainings | person times | 22200 | 44 |
The average training hours completed per employee by gender and employee category.
Indicator | Unit | 2013 | Report Pages |
---|---|---|---|
Total person times of training for SEG Group employees | person times | 30800 | 44 |
Number of suppliers by geographical region.
Indicator | Unit | 2013 | Report Pages |
---|---|---|---|
Contractors hired in China for overseas projects | people | 6354 | 50 |
Overseas projects executed | contracts | 20 | 50 |
Number of products and service related complaints received and how they are dealt with.
Indicator | Unit | 2013 | Report Pages |
---|---|---|---|
Value of new contracts signed | billion RMB | 81.989 | 4 |
Description of practices relating to observing and protecting intellectual property rights.
Indicator | Unit | 2013 | Report Pages |
---|---|---|---|
Total number of shares | shares | 4428000000 | 12 |
Description of quality assurance process and recall procedures.
Indicator | Unit | 2013 | Report Pages |
---|---|---|---|
Projects won Award of Outstanding Heavy Lifting Performance | projects | 5 | 35 |
Projects won Gold, Silver Award for National EPC Projects | projects | 11 | 35 |
Projects won National Excellent Welding Engineering Award | projects | 5 | 35 |
Projects won provincial and ministerial-level quality awards | projects | 32 | 35 |
Number of concluded legal cases regarding corrupt practices brought against the issuer or its employees during the reporting period and the outcomes of the cases.
Indicator | Unit | 2013 | Report Pages |
---|---|---|---|
Paid interim dividend | RMB per share | 0.134 | 4 |
Description of preventive measures and whistle-blowing procedures, and how they are implemented and monitored.
Indicator | Unit | 2013 | Report Pages |
---|---|---|---|
Investment in risk control | million RMB | 84.99 | 37 |
Focus areas of contribution (e.g. education, environmental concerns, labour needs, health, culture, sport).
Indicator | Unit | 2013 | Report Pages |
---|---|---|---|
All-year recommended dividend | RMB per share | 0.324 | 4 |
Board of Directors recommended final dividend | RMB per share | 0.19 | 4 |
Foreign countries with executed projects | countries | 4 | 50 |
Resources contributed (e.g. money or time) to the focus area.
Indicator | Unit | 2013 | Report Pages |
---|---|---|---|
Donation to Wulong Village for public welfare | RMB | 93000 | 48 |
External donations | RMB | 1917900 | 11 |
Total dividend planned to be paid in cash | billion RMB | 1.435 | 12 |
Total value of all contracts by end of 2013 | billion RMB | 103.968 | 4 |
Year-on-year net profit growth | percent | 10.2 | 4 |
The types of emissions and respective emissions data.
Standard Indicator | Unit | 2003 | 2005 | 2010 | 2014 | 2017 |
---|---|---|---|---|---|---|
SOₓ Emissions | ppm | 800 | 500 | 150 | 50 | 10 |
Direct (Scope 1) and energy indirect (Scope 2) greenhouse gas emissions (in tonnes) and, where appropriate, intensity (e.g. per unit of production volume, per facility).
Standard Indicator | Unit |
---|---|
Total GHG Emissions | % reduction year-on-year at Shengli Petrochemical Plant |
Direct and/or indirect energy consumption by type (e.g. electricity, gas or oil) in total (kWh in '000s) and intensity (e.g. per unit of production volume, per facility).
Standard Indicator | Unit | 2013 |
---|---|---|
Diesel Fuel Consumption | MTPA | 8.3 |
Total workforce by gender, employment type (for example, full- or part-time), age group and geographical region.
Standard Indicator | Unit | 2013 |
---|---|---|
Number of Female Employees | employees | 5190 |
Number of Male Employees | employees | 14029 |
Number of New Employees | employees | 182 |
Number of Total Employees | employees | 19219 |
Percentage of Employees of Ethnic Groups | % | 2.95 |
Percentage of Female Employees | % | 27 |
Description of occupational health and safety measures adopted, and how they are implemented and monitored.
Standard Indicator | Unit | 2013 |
---|---|---|
Health Check Coverage for Employees | % | 100 |
The percentage of employees trained by gender and employee category (e.g. senior management, middle management).
Standard Indicator | Unit | 2013 |
---|---|---|
Percentage of Trained Operational Employees | person times | 1400 |
Percentage of Trained Technical Employees | person times | 22200 |
The average training hours completed per employee by gender and employee category.
Standard Indicator | Unit | 2013 |
---|---|---|
Total Training Hours | person times | 30800 |
Resources contributed (e.g. money or time) to the focus area.
Standard Indicator | Unit | 2013 |
---|---|---|
Total Cash Donations | RMB | 2010900 |
Total Public Welfare Donations | RMB | 2010900 |