Sustainability Report 2020

Year: 2020
Published: 2021-06-01
Status: Processed

Extracted ESG KPIs

KPIs are organized by ESG aspects.

The types of emissions and respective emissions data.

Indicator Unit 2019 2020 Report Pages
Dust emission Density g/kWh 0.007 0.008 56
Dust emission Total '000 tonnes 0.429 0.491 56
Dust emission density g/kWh 0.008 21
Nitrogen oxide emission Density g/kWh 0.133 0.155 56
Nitrogen oxide emission Total '000 tonnes 7.874 8.978 56
Nitrogen oxide emission density g/kWh 0.155 21
Sulphur dioxide emission Density g/kWh 0.076 0.087 56
Sulphur dioxide emission Total '000 tonnes 4.478 5.063 56
Sulphur dioxide emission density g/kWh 0.087 21

Direct (Scope 1) and energy indirect (Scope 2) greenhouse gas emissions (in tonnes) and, where appropriate, intensity (e.g. per unit of production volume, per facility).

Indicator Unit 2020 Report Pages
Carbon dioxide emissions (Dabieshan Power Plant) Scope 1 '000 tonnes 5063 56
Equivalent to reduction of carbon dioxide emissions tonnes 27003765 21
Group's total carbon emission thousand tonnes 27037.65 6
Interest range - Natural Gas Power % ~13.88-90 8

Total non-hazardous waste produced (in tonnes) and, where appropriate, intensity (e.g. per unit of production volume, per facility).

Indicator Unit 2019 2020 Report Pages
Discharge of non-hazardous solid wastes Density g/kWh 33.2 29.3 57
Discharge of non-hazardous solid wastes Total '000 tonnes 1963 1701 57
Interest range - Coal-fired Power % ~9.50-100 8

Description of how hazardous and non-hazardous wastes are handled, and a description of reduction target(s) set and steps taken to achieve them.

Indicator Unit 2020 Report Pages
Comprehensive utilization rate of fly ash 89.27% 21, 56

Direct and/or indirect energy consumption by type (e.g. electricity, gas or oil) in total (kWh in '000s) and intensity (e.g. per unit of production volume, per facility).

Indicator Unit 2016 2017 2018 2019 2020 Report Pages
Attributable Installed Capacity - Changshu Power Plant MW 1660 11
Attributable Installed Capacity - Coal-fired Power (Projects Under Construction) MW 2000 11
Attributable Installed Capacity - Coal-fired Power Plant - Anhui MW 4044 11
Attributable Installed Capacity - Coal-fired Power Plant - Guizhou MW 1254 11
Attributable Installed Capacity - Coal-fired Power Plant - Henan MW 2860 11
Attributable Installed Capacity - Coal-fired Power Plant - Hubei MW 1326 11
Attributable Installed Capacity - Coal-fired Power Plant - Shanxi MW 960 11
Attributable Installed Capacity - Coal-fired Power Plant - Sichuan MW 612 11
Attributable Installed Capacity - Coal-fired Power Plant - Sub-total MW 11056 11
Attributable Installed Capacity - Fushan Power Station MW 37.5 11
Attributable Installed Capacity - Guangxi Overseas MW 229.7 11
Attributable Installed Capacity - Hydropower (Projects Under Construction) MW 315 11
Attributable Installed Capacity - Jinzhishan Wind Power MW 31.6 11
Attributable Installed Capacity - Liyujiang Power Plant MW 151.2 11
Attributable Installed Capacity - Main Associates, Joint Ventures, Investment Holding Companies - Total MW 4738.5 11
Attributable Installed Capacity - Natural Gas Power (Projects Under Construction) MW 321.6 11
Attributable Installed Capacity - Photovoltaic Power (Projects Under Construction) MW 604.5 11
Attributable Installed Capacity - Projects Under Construction - Total MW 4357.1 11
Attributable Installed Capacity - Shanghai Power MW 2032.4 11
Attributable Installed Capacity - Sichuan Energy Investment MW 12.7 11
Attributable Installed Capacity - Sujin Energy MW 283.4 11
Attributable Installed Capacity - Wind Power (Projects Under Construction) MW 1116 11
Attributable Installed Capacity - Xintang Power Plant MW 300 11
Attributable installed capacity MW 23878.2 22
Attributable installed capacity - Coal-fired Power MW 14484.6 8
Attributable installed capacity - Hydropower MW 3507.8 8
Attributable installed capacity - Natural Gas Power MW 506.2 8
Attributable installed capacity - Photovoltaic Power MW 3389.1 8
Attributable installed capacity - Wind Power MW 1990.5 8
Attributable installed capacity as percentage of clean energy 39.34% 8
Attributable installed capacity of clean energy MW 9393.6 8
Clean Energy Share of Total Installed Capacity - SPIC % 56.25% 11
Clean energy power generation MWh 33903032 21
Coal consumption rate g/kWh 301.82 303.31 53
Coal consumption rate of the Group g/kWh 303.31 53
Cumulative incentive electricity for environmental protection MWh 628000 53
Decrease in total energy consumption cost (July to December 2020 vs. same period 2019) from Baozhigu Integrated Intelligent Energy Demonstration Project 31.73% 50
Economic coal consumed for blending combustion tonnes 7614000 53
Group's attributable installed capacity of clean energy MW 9936 6
Group's clean energy power generation GWh 33093.032 6
Hydropower Attributable Installed Capacity - Guangxi MW 409.1 10
Hydropower Attributable Installed Capacity - Guizhou MW 939.7 10
Hydropower Attributable Installed Capacity - Hunan MW 1959.2 10
Hydropower Attributable Installed Capacity - Sichuan MW 98.7 10
Hydropower Attributable Installed Capacity Sub-total MW 3406.7 10
Hydropower Installed Capacity - Guangxi MW 630 10
Hydropower Installed Capacity - Guizhou MW 1570 10
Hydropower Installed Capacity - Hunan MW 3109.7 10
Hydropower Installed Capacity - Sichuan MW 165.4 10
Hydropower Installed Capacity Sub-total MW 5475.1 10
Hydropower Interest - Guangxi % 64.93 10
Hydropower Interest - Guizhou % 59.85 10
Hydropower Interest - Hunan % 63 10
Hydropower Interest - Sichuan % ~44.1-63 10
Installed Capacity - Changshu Power Plant MW 3320 11
Installed Capacity - Coal-fired Power (Projects Under Construction) MW 2000 11
Installed Capacity - Coal-fired Power Plant - Anhui MW 5860 11
Installed Capacity - Coal-fired Power Plant - Guizhou MW 1320 11
Installed Capacity - Coal-fired Power Plant - Henan MW 2860 11
Installed Capacity - Coal-fired Power Plant - Hubei MW 2600 11
Installed Capacity - Coal-fired Power Plant - Shanxi MW 1200 11
Installed Capacity - Coal-fired Power Plant - Sichuan MW 1200 11
Installed Capacity - Coal-fired Power Plant - Sub-total MW 15040 11
Installed Capacity - Fushan Power Station MW 75 11
Installed Capacity - Guangxi Overseas MW 574.2 11
Installed Capacity - Hydropower (Projects Under Construction) MW 500 11
Installed Capacity - Jinzhishan Wind Power MW 207.4 11
Installed Capacity - Liyujiang Power Plant MW 600 11
Installed Capacity - Main Associates, Joint Ventures, Investment Holding Companies - Total MW 23141.1 11
Installed Capacity - Natural Gas Power (New Development Projects) MW 35 11
Installed Capacity - Natural Gas Power (Projects Under Construction) MW 321.6 11
Installed Capacity - New Development Projects - Total MW 4750 11
Installed Capacity - Photovoltaic Power (Projects Under Construction) MW 978.9 11
Installed Capacity - Projects Under Construction - Total MW 5682.9 11
Installed Capacity - Renewable Energy (New Development Projects) MW 4715 11
Installed Capacity - Shanghai Power MW 14642.6 11
Installed Capacity - Sichuan Energy Investment MW 138.7 11
Installed Capacity - Sujin Energy MW 2983.2 11
Installed Capacity - Wind Power (Projects Under Construction) MW 1882.4 11
Installed Capacity - Xintang Power Plant MW 600 11
Installed Capacity of Clean Energy - SPIC MW 99000 11
Installed capacity - Coal-fired Power MW 29992.7 8
Installed capacity - Hydropower MW 5834.7 8
Installed capacity - Natural Gas Power MW 2802.2 8
Installed capacity - Photovoltaic Power MW 6268.6 8
Installed capacity - Wind Power MW 5015.4 8
Interest range - Hydropower % ~9.13-64.93 8
Interest range - Photovoltaic Power % ~13.88-100 8
Interest range - Wind Power % ~13.88-98.73 8
Load rate during ultra-low load and oil-free operation at Dabieshan Power Plant #3 unit % 39 54
Load reduced during ultra-low load and oil-free operation at Dabieshan Power Plant #3 unit MW 260 54
Natural Gas Power Attributable Installed Capacity - Hubei MW 138.6 10
Natural Gas Power Attributable Installed Capacity Sub-total MW 138.6 10
Natural Gas Power Installed Capacity - Hubei MW 154 10
Natural Gas Power Installed Capacity Sub-total MW 154 10
Natural Gas Power Interest - Hubei % 90 10
Net coal consumption rate g/kWh 303.31 21
Percentage of clean energy in total attributable installed capacity % 39.34 6
Photovoltaic Power Attributable Installed Capacity - Anhui MW 338.2 10
Photovoltaic Power Attributable Installed Capacity - Beijing MW 1.4 10
Photovoltaic Power Attributable Installed Capacity - Guangdong MW 24.9 10
Photovoltaic Power Attributable Installed Capacity - Guangxi MW 63 10
Photovoltaic Power Attributable Installed Capacity - Guizhou MW 100 10
Photovoltaic Power Attributable Installed Capacity - Heilongjiang MW 152 10
Photovoltaic Power Attributable Installed Capacity - Henan MW 77.2 10
Photovoltaic Power Attributable Installed Capacity - Hubei MW 481.4 10
Photovoltaic Power Attributable Installed Capacity - Hunan MW 37.3 10
Photovoltaic Power Attributable Installed Capacity - Inner Mongolia MW 52.9 10
Photovoltaic Power Attributable Installed Capacity - Jiangsu MW 4.5 10
Photovoltaic Power Attributable Installed Capacity - Liaoning MW 525 10
Photovoltaic Power Attributable Installed Capacity - Ningxia MW 229.6 10
Photovoltaic Power Attributable Installed Capacity - Shandong MW 157.6 10
Photovoltaic Power Attributable Installed Capacity - Shanxi MW 785 10
Photovoltaic Power Attributable Installed Capacity - Tianjin MW 3.4 10
Photovoltaic Power Attributable Installed Capacity - Xinjiang MW 12.6 10
Photovoltaic Power Attributable Installed Capacity Sub-total MW 3046 10
Photovoltaic Power Installed Capacity - Anhui MW 361.6 10
Photovoltaic Power Installed Capacity - Beijing MW 2.3 10
Photovoltaic Power Installed Capacity - Guangdong MW 34 10
Photovoltaic Power Installed Capacity - Guangxi MW 70 10
Photovoltaic Power Installed Capacity - Guizhou MW 100 10
Photovoltaic Power Installed Capacity - Heilongjiang MW 200 10
Photovoltaic Power Installed Capacity - Henan MW 206 10
Photovoltaic Power Installed Capacity - Hubei MW 656.8 10
Photovoltaic Power Installed Capacity - Hunan MW 69 10
Photovoltaic Power Installed Capacity - Inner Mongolia MW 90 10
Photovoltaic Power Installed Capacity - Jiangsu MW 4.5 10
Photovoltaic Power Installed Capacity - Liaoning MW 525 10
Photovoltaic Power Installed Capacity - Ningxia MW 640 10
Photovoltaic Power Installed Capacity - Shandong MW 186.2 10
Photovoltaic Power Installed Capacity - Shanxi MW 830 10
Photovoltaic Power Installed Capacity - Tianjin MW 9.7 10
Photovoltaic Power Installed Capacity - Xinjiang MW 20 10
Photovoltaic Power Installed Capacity Sub-total MW 4005.1 10
Photovoltaic Power Interest - Anhui % ~35.7-100 10
Photovoltaic Power Interest - Beijing % ~51-100 10
Photovoltaic Power Interest - Guangdong % ~34.65-100 10
Photovoltaic Power Interest - Guangxi % ~64.93-100 10
Photovoltaic Power Interest - Guizhou % 100 10
Photovoltaic Power Interest - Heilongjiang % ~70-100 10
Photovoltaic Power Interest - Henan % ~34.65-100 10
Photovoltaic Power Interest - Hubei % ~34.65-100 10
Photovoltaic Power Interest - Hunan % ~32.13-63 10
Photovoltaic Power Interest - Inner Mongolia % ~44.1-63 10
Photovoltaic Power Interest - Jiangsu % 100 10
Photovoltaic Power Interest - Liaoning % 100 10
Photovoltaic Power Interest - Ningxia % ~32.13-44.1 10
Photovoltaic Power Interest - Shandong % ~44.1-100 10
Photovoltaic Power Interest - Shanxi % ~70-100 10
Photovoltaic Power Interest - Tianjin % 35.7 10
Photovoltaic Power Interest - Xinjiang % 63 10
Total Installed Capacity - SPIC MW 176000 11
Total electricity sold MWh 60760318 64053714 70964796 83558993 88255525 22
Total fuel consumption of corporate vehicles Liter 727340 653400 62
Total installed capacity MW 49913.6 8
Total power consumption of office building MWh 13038.59 11956.17 62
Wind Power Attributable Installed Capacity - Gansu MW 44.1 10
Wind Power Attributable Installed Capacity - Guangxi MW 620.8 10
Wind Power Attributable Installed Capacity - Henan MW 28 10
Wind Power Attributable Installed Capacity - Hunan MW 264.1 10
Wind Power Attributable Installed Capacity - Shandong MW 323.1 10
Wind Power Attributable Installed Capacity - Shanxi MW 28.4 10
Wind Power Attributable Installed Capacity - Xinjiang MW 124.8 10
Wind Power Attributable Installed Capacity - Yunnan MW 59.1 10
Wind Power Attributable Installed Capacity Sub-total MW 1492.4 10
Wind Power Installed Capacity - Gansu MW 100 10
Wind Power Installed Capacity - Guangxi MW 653.5 10
Wind Power Installed Capacity - Henan MW 46.6 10
Wind Power Installed Capacity - Hunan MW 470 10
Wind Power Installed Capacity - Shandong MW 506.1 10
Wind Power Installed Capacity - Shanxi MW 50 10
Wind Power Installed Capacity - Xinjiang MW 198 10
Wind Power Installed Capacity - Yunnan MW 147.4 10
Wind Power Installed Capacity Sub-total MW 2171.6 10
Wind Power Interest - Gansu % 44.1 10
Wind Power Interest - Guangxi % 95 10
Wind Power Interest - Henan % 60 10
Wind Power Interest - Hunan % ~44.1-63 10
Wind Power Interest - Shandong % ~51-98.73 10
Wind Power Interest - Shanxi % 56.7 10
Wind Power Interest - Xinjiang % 63 10
Wind Power Interest - Yunnan % ~32.13-44.1 10

Water consumption in total and intensity (e.g. per unit of production volume, per facility).

Indicator Unit 2019 2020 Report Pages
Total water consumption Million tonnes 87.17 91.09 53
Total water consumption of office building Ton 154029 156808 62
Water consumption per unit g/kWh 1471 1571 53

Description of energy use efficiency target(s) set and steps taken to achieve them.

Indicator Unit 2020 Report Pages
Fuel cost saving from ultra-low load and oil-free operation at Dabieshan Power Plant #3 unit RMB 70000 54

Total packaging material used for finished products (in tonnes) and, if applicable, with reference to per unit produced.

Indicator Unit 2019 2020 Report Pages
Total office paper used Ton 30.37 37.31 62

Description of the significant impacts of activities on the environment and natural resources and the actions taken to manage them.

Indicator Unit 2020 Report Pages
Amount invested in environmental technological upgrade million RMB 2859 6
Investment in environmental protection technical upgrade RMB'000 258700 21

Total workforce by gender, employment type (for example, full- or part-time), age group and geographical region.

Indicator Unit 2020 Report Pages
Employees aged 29 and below 2786 86
Employees aged 30-39 1987 86
Employees aged 40-49 3036 86
Employees aged 50 and above 2711 86
Employees in Central China 3461 86
Employees in East China 2879 86
Employees in North China 2533 86
Employees in Northeast China 42 86
Employees in South China 706 86
Employees in Southwest China 899 86
Female employees 2181 86
Fresh graduates joined the Company 282 86
Full-time employees 10520 86
General staff employees 10073 86
Labor contract signing rate 100% 86
Male employees 8339 86
Middle management employees 401 86
Senior management employees 46 86
Social insurance coverage rate 100% 86
Total assets RMB'000 155948671 22
Total number of employees in the Group 10520 86

Employee turnover rate by gender, age group and geographical region.

Indicator Unit 2020 Report Pages
Employee turnover rate - Aged 29 and below % 6.14 87
Employee turnover rate - Aged 30-39 % 3.5 87
Employee turnover rate - Aged 40-49 % 0.96 87
Employee turnover rate - Aged 50 and above % 0.93 87
Employee turnover rate - Central China % 4.36 87
Employee turnover rate - East China % 0.8 87
Employee turnover rate - Female % 3.81 87
Employee turnover rate - Full-time % 2.59 87
Employee turnover rate - General staff % 2.67 87
Employee turnover rate - Male % 2.27 87
Employee turnover rate - Middle management % 0.5 87
Employee turnover rate - North China % 0.47 87
Employee turnover rate - Senior management % 2.17 87
Employee turnover rate - South China % 1.56 87
Employee turnover rate - Southwest China % 8.34 87
Number of resigned employees - Aged 29 and below person 122 87
Number of resigned employees - Aged 30-39 person 95 87
Number of resigned employees - Aged 40-49 person 29 87
Number of resigned employees - Aged 50 and above person 26 87
Number of resigned employees - Central China person 151 87
Number of resigned employees - East China person 23 87
Number of resigned employees - Female person 83 87
Number of resigned employees - Full-time person 272 87
Number of resigned employees - General staff person 269 87
Number of resigned employees - Male person 189 87
Number of resigned employees - Middle management person 2 87
Number of resigned employees - North China person 12 87
Number of resigned employees - Senior management person 1 87
Number of resigned employees - South China person 11 87
Number of resigned employees - Southwest China person 75 87

Description of occupational health and safety measures adopted, and how they are implemented and monitored.

Indicator Unit 2020 Report Pages
Number of comprehensive emergency plans 43 76
Number of emergency drills organized 1844 76
Number of emergency plans released 2109 76
Number of on-site handling plans 1441 76
Number of participants in emergency drills 19704 76
Number of specialized emergency plans 625 76

The percentage of employees trained by gender and employee category (e.g. senior management, middle management).

Indicator Unit 2019 2020 Report Pages
Coverage rate of employees training % 100% 89
Number of training sessions for general staff sessions 27960 89
Number of training sessions for middle management sessions 480 89
Number of training sessions for senior management sessions 69 89
Number of young employees receiving Team Awards and Individual Awards in skill competitions 46 89
Training coverage rate for general staff % 100 89
Training coverage rate for middle management % 100 89
Training coverage rate for senior management % 100 89
Video conference Time 1629 2269 62

The average training hours completed per employee by gender and employee category.

Indicator Unit 2020 Report Pages
Total amount in technological R&D RMB'000 676051 22
Total investments in employees training RMB 30797400 89
Total training hours for employees hours 611946 89
Training hours per capita for general staff hours 57 89
Training hours per capita for middle management hours 87 89
Training hours per capita for senior management hours 63 89

Number of suppliers by geographical region.

Indicator Unit 2020 Report Pages
Net assets per share (excluding non-controlling interests and other equity instruments) RMB 1.3 7
Overseas asset capacity (Australia, Brazil, Chile, Mexico) MW 5700 7

Number of products and service related complaints received and how they are dealt with.

Indicator Unit 2020 Report Pages
Various taxes paid RMB'000 2429509 22

Number of concluded legal cases regarding corrupt practices brought against the issuer or its employees during the reporting period and the outcomes of the cases.

Indicator Unit 2016 2017 2018 2019 2020 Report Pages
Corporate income tax paid RMB'000 1094790 466947 528533 629883 551315 22
Interest - Changshu Power Plant % 50 11
Interest - Coal-fired Power (Projects Under Construction) % 100 11
Interest - Coal-fired Power Plant - Anhui % ~60-100 11
Interest - Coal-fired Power Plant - Guizhou % 95 11
Interest - Coal-fired Power Plant - Henan % 100 11
Interest - Coal-fired Power Plant - Hubei % 51 11
Interest - Coal-fired Power Plant - Shanxi % 80 11
Interest - Coal-fired Power Plant - Sichuan % 51 11
Interest - Fushan Power Station % 50 11
Interest - Guangxi Overseas % 40 11
Interest - Hydropower (Projects Under Construction) % 63 11
Interest - Jinzhishan Wind Power % 15.22 11
Interest - Liyujiang Power Plant % 25.2 11
Interest - Natural Gas Power (Projects Under Construction) % 100 11
Interest - Photovoltaic Power (Projects Under Construction) % ~41-100 11
Interest - Shanghai Power % 13.88 11
Interest - Sichuan Energy Investment % 9.13 11
Interest - Sujin Energy % 9.5 11
Interest - Wind Power (Projects Under Construction) % ~32.13-100 11
Interest - Xintang Power Plant % 50 11

Focus areas of contribution (e.g. education, environmental concerns, labour needs, health, culture, sport).

Indicator Unit 2020 Report Pages
Basic earnings per share RMB 0.17 7
Cumulative poverty alleviation through consumption 10000 RMB 832.07 7
Donations to support the education for underprivileged students 10000 RMB 455.548 7

Resources contributed (e.g. money or time) to the focus area.

Indicator Unit 2016 2017 2018 2019 2020 Report Pages
Amount invested in technological development million RMB 676 6
Number of voluntary services organized in 'Yingshanhong' project 287 7
Revenue RMB'000 18866153 19966811 23175626 27763287 28427721 22
Taxes and fees paid by the Group million RMB 2430 7
Year-on-year net profit growth % 32.91 7

The types of emissions and respective emissions data.

Standard Indicator Unit 2019 2020
Airborne Particulate Matter (PM) Emissions tonnes 429 491
NOâ‚“ Emissions tonnes 7874 8978
SOâ‚“ Emissions tonnes 4478 5063

Direct (Scope 1) and energy indirect (Scope 2) greenhouse gas emissions (in tonnes) and, where appropriate, intensity (e.g. per unit of production volume, per facility).

Standard Indicator Unit 2020
Direct GHG Emissions (Scope 1) tonnes 5063000
Total GHG Emissions tonnes 27037650

Total non-hazardous waste produced (in tonnes) and, where appropriate, intensity (e.g. per unit of production volume, per facility).

Standard Indicator Unit 2019 2020
Non-Hazardous Waste Disposed tonnes 1963000 1701000
Total Non-Hazardous Waste Intensity (By Unit Product) g/kWh 33.2 29.3

Description of emissions target(s) set and steps taken to achieve them.

Standard Indicator Unit
GHG Emissions Reduction Percentage Compared to Last Year %

Direct and/or indirect energy consumption by type (e.g. electricity, gas or oil) in total (kWh in '000s) and intensity (e.g. per unit of production volume, per facility).

Standard Indicator Unit 2016 2017 2018 2019 2020
Coal Consumption Rate g/kWh 301.82 303.31
Fossil Fuel Consumption tonnes 7614000
Hydropower Energy MW 3507.8
Natural Gas Consumption cubic meters 727340 653400
Percentage of Renewable Energy Consumption % 39.34
Purchased Electricity MWh 13038.59 11956.17
Solar Energy MW 3389.1
Sold Electricity MWh 60760318 64053714 70964796 83558993 88255525
Wind Energy MW 117000

Water consumption in total and intensity (e.g. per unit of production volume, per facility).

Standard Indicator Unit 2019 2020
Water Consumption Million tonnes 87.17 91.09
Water Consumption in Office Ton 154029 156808

Description of energy use efficiency target(s) set and steps taken to achieve them.

Standard Indicator Unit
Electricity Usage Reduction Compared to Last Year MWh
Electricity Usage Reduction Percentage Compared to Last Year %
Investment in Energy-saving and Emission-reduction Technology Transformation million RMB

Total packaging material used for finished products (in tonnes) and, if applicable, with reference to per unit produced.

Standard Indicator Unit 2019 2020
Packaging Material Consumption (Paper) Ton 30.37 37.31

Description of the significant impacts of activities on the environment and natural resources and the actions taken to manage them.

Standard Indicator Unit 2020
Total Investment in Ecological Restoration RMB 2587000000

Total workforce by gender, employment type (for example, full- or part-time), age group and geographical region.

Standard Indicator Unit 2020
Number of Employees Aged 30-50 5023
Number of Employees Aged Above 50 2711
Number of Employees Aged Below 30 2786
Number of Employees in Central China 3461
Number of Employees in East China 2879
Number of Employees in North China 2533
Number of Employees in Northeast China 42
Number of Employees in South China 706
Number of Employees in Southwest China 899
Number of Female Employees 2181
Number of Full-time Employees 10520
Number of General Employees 10073
Number of Male Employees 8339
Number of Middle Management Employees 401
Number of New Employees 282
Number of Senior Management Employees 46
Number of Total Employees 10520
Percentage of Employees Aged 30-50 % 47.8
Percentage of Employees Aged Above 50 % 25.8
Percentage of Employees Aged Below 30 % 26.5
Percentage of Employees in Central China % 32.9
Percentage of Employees in East China % 27.4
Percentage of Employees in North China % 24.1
Percentage of Employees in Northeast China % 0.4
Percentage of Employees in South China % 6.7
Percentage of Employees in Southwest China % 8.5
Percentage of Female Employees % 20.7
Percentage of Full-time Employees % 100
Percentage of General Employees % 95.8
Percentage of Male Employees % 79.3
Percentage of Middle Management Employees % 3.8
Percentage of New Employees % 2.7
Percentage of Senior Management Employees % 0.4

Employee turnover rate by gender, age group and geographical region.

Standard Indicator Unit 2020
Turnover Rate of Employees Aged 30-50 % 4.46
Turnover Rate of Employees Aged Above 50 % 0.93
Turnover Rate of Employees Aged Below 30 % 6.14
Turnover Rate of Employees in Central China % 4.36
Turnover Rate of Employees in East China % 0.8
Turnover Rate of Employees in North China % 0.47
Turnover Rate of Employees in South China % 1.56
Turnover Rate of Employees in Southwest China % 8.34
Turnover Rate of Female Employees % 3.81
Turnover Rate of Full-time Employees % 2.59
Turnover Rate of General Employees % 2.67
Turnover Rate of Male Employees % 2.27
Turnover Rate of Middle Management Employees % 0.5
Turnover Rate of Senior Management Employees % 2.17

Description of occupational health and safety measures adopted, and how they are implemented and monitored.

Standard Indicator Unit 2020
Number of People Receiving Training on Work Safety 19704
Number of Production Safety Emergency Drills 1844

The percentage of employees trained by gender and employee category (e.g. senior management, middle management).

Standard Indicator Unit 2020
Percentage of Employees Trained % 100
Percentage of Trained General Employees % 100
Percentage of Trained Middle Management % 100
Percentage of Trained Senior Management % 100

The average training hours completed per employee by gender and employee category.

Standard Indicator Unit 2020
Average Training Hours (General Staff) hours 57
Average Training Hours (Middle Management) hours 87
Average Training Hours (Senior Management) hours 63
Total Training Hours hours 611946

Resources contributed (e.g. money or time) to the focus area.

Standard Indicator Unit 2020
Number of Volunteer Activities Sessions 287